Skoda Octavia 2 1z 2009 Towbar installation
januari 16th, 2011 by
ltz
Some orientating pictures from a Kovil towbar installation procedure. Use on you own risk.
Electrical installation was done through the predrilled holes to the left and right of the towbar – into the spare wheel bucket. Then up to the left where all necessary cables for this relay-based electrical kit where.
Posted in Automotive |
Kommentering avstängd





















