Skoda Octavia 2 1z 2009 Towbar installation

januari 16th, 2011 by ltz

Some orientating pictures from a Kovil towbar installation procedure. Use on you own risk.

Electrical installation was done through the predrilled holes to the left and right of the towbar – into the spare wheel bucket. Then up to the left where all necessary cables for this relay-based electrical kit where.

Posted in Automotive | Kommentering avstängd

Comments are closed.